Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Jul 12, 2022     Fuel System - (1.2 hours)       Category: Fuselage
Received the new bender and it looks great. It was making a small dent in the tube (the same way the initial pittsburg bender did) and I fixed that with a file. Then I started modifications to the tool similar to the pittsburg, but am making the pocket for the flare and sleeve closer to the 0 degree mark on the tool so the distance from the sealing surface to the outside of the bend will be smaller. I attached some pictures.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.